Business documents

Free construction estimate template

Price a construction job line by line: demolition, framing, drywall, electrical, paint, dumpster. Totals, tax and deposit calculate themselves. Download as PDF to send or Excel to fine-tune.

This is sample data so you can see the result.

Your business

From

Estimate details

Valid until:
Prepared for

Line items

$1,250.00
$1,392.00
$1,512.00
$1,800.00
$1,536.00
$425.00
Description · Qty · Unit · Rate · Amount

Notes & terms

Next step

Create the next document with the same customer and items in one click.

Morgan Build & Repair

ESTIMATE

From
Morgan Build & Repair
Alex Morgan
410 Market Street
Springfield, IL 62701
(555) 014-2290
Prepared for
Jordan Lee
27 Oak Avenue
Springfield, IL 62704
Estimate #EST-2026-001
DateNov 21, 2026
Valid untilDec 21, 2026
Project / job siteBasement finishing, 27 Oak Avenue
DescriptionQtyUnitRateAmount
Demolition and removal of existing drywall1job$1,250.00$1,250.00
Framing – 2×4 studs, labor24hr$58.00$1,392.00
Drywall 1/2" sheets incl. hanging and taping36sheet$42.00$1,512.00
Electrical rough-in (licensed electrician)1job$1,800.00$1,800.00
Interior paint, two coats640sq ft$2.40$1,536.00
Dumpster rental1week$425.00$425.00
Subtotal$7,915.00
Sales tax (6.25%)$494.69
Estimate total$8,409.69
Notes

This estimate is based on the information available today. Prices may change if the scope of work changes.

Terms

Estimate valid for 30 days. A deposit is due before work begins; the balance is due on completion.

Customer acceptance
Date
Created with PlanPrint – free business document templates

Free documents include a small "Created with PlanPrint" line.

How to build a construction estimate that holds up

  1. Break the job into phases (demo, framing, rough-ins, drywall, finishes) instead of one lump sum. Clients accept detailed prices more easily, and a later change order is easier to price.
  2. Separate labor and materials: labor in hours, materials by unit (sheets, square feet, linear feet).
  3. Include the "invisible" costs: permits, dumpster, equipment rental, delivery, clean-up.
  4. Add your markup and contingency as their own lines or inside your rates. Many contractors plan 5–10 % contingency on renovations.
  5. Ask for a deposit and state the validity period: material prices move.

When the job is done, switch the same document to a construction invoice.

Frequently asked questions

Should I show my markup on the estimate?

Most contractors build markup into their unit prices. If your client expects open-book pricing, add markup as a separate line.

How do I estimate square-foot items?

Use "sq ft" as the unit, enter the area as quantity and your price per square foot as rate.

Can I download it as Word or Excel?

Yes. Every document downloads as PDF, Word (.docx) and Excel (.xlsx). The Excel file keeps working formulas for line totals, tax and the grand total, so you can keep editing it offline.

Is it really free?

Yes. Creating and downloading documents is free and needs no account. Free documents carry a small "Created with PlanPrint" line at the bottom. Documents Pro removes it and adds a saved client and item library.

Guides